Permission to make Additions or Alterations to the installed Lift

English

Who should apply?

Every owner who installs a lift shall apply for permission to make additions or alterations to the installed lift.

Documents Required:

 1. Layout of lift installation
 2. Plan
 3. Sectional elevation
 4. Arrangement of doors
 5. Lift well enclosure
 6. Size and position of the machine room relating to the lift well
 7. Position of hoisting machines
 8. Number of floors to be served and total travel
 9. Wiring diagram of the lift well enclosure, machine room, control panel and lift equipment

Timeline:

15 (Fifteen) working days from the date of submission of application, completed in all respects along with documents as per checklist.

Fees and Payments:

Not Available.
 